Hello, I introduce myself, I am John Doe. We have a plot of 300 SQM on the island of Siargao. We would like to build a BUILDING on this site. In order to confirm our budget and to start the construction, we would need to establish a construction quote.

You will find in attached the details in PDF of the contruction and volumes.

The project consist in 4 shops (6m x 8.5m) and one roof top (24m x 10).

We want an estimate containing:

  • Construction (concrete, iron, etc.) raw ready to receive ceramic or paint. (fittings, ceramic, doors, etc. not included)
  • 5 electric meters (1 per shop and 1 for the roof top)
  • Location for electrical cables (electrical outlets, lights, aircon, fan etc.)
  • one clean water supply per pitch (total 5)
  • provide a system for wastewater (common or individual)
  • building permit (by law)

All installations, clean water, waste water and electricity must meet the standards and laws in force of the Filipino government on the island of SIARGAO.

The PDF gives an idea of the project once finished but we want an estimate for the gross building + electricity + clean water + waste water.
This estimate should not take into account:

  • furnishing materials (wood, ceramic, paint)
  • toilet / sink / plumbing
  • closing (door / window / etc)

Cordially,

John

Sample response:

Hi John,

Here are the costing estimates:

  • Raw Structure/Architectural (including front pavers and side stair area) (tile ready floors, paint ready walls, with electrical and plumbing rough ins) (glass works, glass and wooden windows, and wooden facade excluded) (fittings, ceramic, doors, and other finishing items excluded)= p7.43m
  • Smooth finish painting = p160k; /(Rough finish painting option= 80k)
  • Electrical works with 5 electric meters (labor and materials) (local ordinance compliant) = rough estimate p450k; Detailed costing estimates requires FULLY REFUNDABLE p2.5k estimation fee (to be refunded during start of blueprinting)
  • Plumbing works water and sanitary lines and septic tank (labor and materials) (local ordinance compliant)= rough estimate p250k; Detailed costing estimates requires FULLY REFUNDABLE p2.5k estimation fee (to be refunded during start of blueprinting)
  • Building Permit processing = FREE processing upon 5% commitment on the structure. (govt. fees excluded – to be billed later)
  • Blueprinting = p35k (Fully Refundable upon awarding of construction)
  • Site visit = p10k (Fully Refundable upon awarding of construction)

Here’s a similar project we built recently – https://finefinish.cbu.asia/seguerra-commercial-spaces-in-poblacion-talisay-city/
We accept bank to bank payments thru BDO, Unionbank, Metrobank, or moneygram.

Formal proposal can be sent upon request…